Back to Projects

Project Profile

City of Wichita Plant 2 – Package 2: Preliminary Treatment, Solids & Odor Improvements

Delegated Design

Delegated pipe support design for the City of Wichita Plant 2 Package 2 improvements across preliminary treatment, solids handling, and odor control systems.

City of Wichita Plant 2 - Package 2: Preliminary Treatment, Solids & Odor Improvements

The Work

Project Overview

As one of four pipe support engineering firms pre-approved in the project specifications, JSC Engineers provided delegated design for the City of Wichita Plant 2 Package 2 improvements. The work covered the Screening and Handling Room, Primary Clarifiers, Thickening Facility, Digester Facility, and Odor Control areas. Systems included stainless steel digester gas piping, lined ductile iron sludge services, and plant process water. JSC analyzed the piping in CAESAR II to ASME B31.1 and the specified minimum 5x safety factor. The models produced restraint loads and thermal displacements for every support, and concrete anchorage was designed to ACI 318 cracked-concrete criteria.

Project Details

  • Location: Wichita, Kansas
  • Services Offered: Delegated Design, Pipe Stress Analysis
  • Software Used: CAESAR II, Bentley RAM, Hilti PROFIS

Planning a complex piping or support project?

Let's solve the engineering challenge together.

Discuss Your Project